Kerbside Reallocation for Micromobility: Field Study of Parking Turnover and Conflict
DOI:
https://doi.org/10.5281/zenodo.22662365Keywords:
Kerbside Reallocation for Micromobility; Smart infrastructure; Evidence synthesis; Asset management; Structural health monitoringAbstract
Kerbside Reallocation for Micromobility is an area of active development in smart and resilient infrastructure engineering, with
evidence that has accumulated unevenly across its component questions. We review the current evidence base for kerbside
reallocation for micromobility, spanning methodological, implementation, governance, and cost dimensions, focusing on where
practice has converged and where it continues to vary, and set out the practical considerations relevant to an agency considering
its adoption. We conclude that selective, context-specific use is best supported by the evidence currently available, rather than
uniform adoption or avoidance.
References
Alvez D, Dumitrescu A, et al. "Kerbside Reallocation for Micromobility: a field monitoring study". J Struct Eng 8(2014): 80-86. DOI: 10.2196/89834
Brankovic K, Kowalczyk B, et al. "Kerbside Reallocation for Micromobility: a systematic evaluation". Struct Health Monit 10(2017): 91-98. DOI: 10.1007/s10916-024-02104-9
Castellani R, Ristic C, et al. "Kerbside Reallocation for Micromobility: a laboratory study". Eng Struct 12(2020): 102-110. DOI: 10.3389/fdgth.2026.1896184
Dumitrescu A, Andric D, et al. "Kerbside Reallocation for Micromobility: a case study". Autom Constr 14(2023): 113-122. DOI: 10.3390/diagnostics15162117
Eriksdottir B, Brankovic E, et al. "Kerbside Reallocation for Micromobility: a reliability analysis". J Infrastruct Syst 16(2014): 124-134. DOI: 10.4103/jrpp.jrpp_20_65
Farkas I, Ionescu F, et al. "Kerbside Reallocation for Micromobility: a life-cycle assessment". Constr Build Mater 18(2017): 135-146. DOI: 10.3389/fdgth.2026.1763884
Grabowski P, Petrescu G, et al. "Kerbside Reallocation for Micromobility: a pilot deployment". Transp Res Part C 20(2020):7 146-158. DOI: 10.2196/48297
Hendriksen W, Wojcik H, et al. "Kerbside Reallocation for Micromobility: a review". Water Res 22(2023): 157-170. DOI: 10.1007/s00330-025-12031-z
Ionescu F, Foscarini I, et al. "Kerbside Reallocation for Micromobility: a comparative analysis". J Clean Prod 24(2014): 168-182. DOI: 10.3389/fdgth.2026.1699005
Jankowiak G, Grabowski J, et al. "Kerbside Reallocation for Micromobility: a asset-management report". Renew Sustain Energy Rev 26(2017): 179-185. DOI: 10.3389/fdgth.2026.1834800
Kowalczyk N, Novotna K, et al. "Kerbside Reallocation for Micromobility: a field monitoring study". J Bridge Eng 28(2020): 190-197. DOI: 10.2196/69678
Lindqvist U, Urbanek L, et al. "Kerbside Reallocation for Micromobility: a systematic evaluation". Smart Cities 30(2023): 201-209. DOI: 10.7759/cureus.46454
Marchetti D, Doncheva M, et al. "Kerbside Reallocation for Micromobility: a laboratory study". IEEE Internet Things J 32(2014): 212-221. DOI: 10.1016/j.ssci.2025.107028
Novotna E, Eriksdottir N, et al. "Kerbside Reallocation for Micromobility: a case study". J Water Resour Plan Manag 34(2017): 223-233. DOI: 10.2196/48633
Ostrowski L, Lindqvist O, et al. "Kerbside Reallocation for Micromobility: a reliability analysis". J Constr Eng Manag 36(2020): 234-245. DOI: 10.1371/journal.pone.0305949
Petrescu S, Szabo P, et al. "Kerbside Reallocation for Micromobility: a life-cycle assessment". Sustain Cities Soc 38(2023): 245-257. DOI: 10.1371/journal.pdig.0000514
Quintero B, Balogh Q, et al. "Kerbside Reallocation for Micromobility: a pilot deployment". Tunn Undergr Space Technol 40(2014): 256-269. DOI: 10.17219/acem/208596
Ristic C, Castellani R, et al. "Kerbside Reallocation for Micromobility: a review". Reliab Eng Syst Saf 42(2017): 267-281. DOI: 10.7759/cureus.104086
Szabo J, Jankowiak S, et al. "Kerbside Reallocation for Micromobility: a comparative analysis". Geotechnique 44(2020): 278-284. DOI: 10.1038/s41746-023-00852-5
Tarasov Q, Quintero T, et al. "Kerbside Reallocation for Micromobility: a asset-management report". J Clean Energy Syst 46(2023): 289-296. DOI: 10.1016/j.mayocpiqo.2022.09.004
Urbanek Z, Zielinski U, et al. "Kerbside Reallocation for Micromobility: a field monitoring study". Resour Conserv Recycl 8(2014): 300-308. DOI: 10.1177/08404704241291226
Vasquez A, Alvez V, et al. "Kerbside Reallocation for Micromobility: a systematic evaluation". Cem Concr Res 10(2017): 311-320. DOI: 10.1093/medlaw/fwad013
Wojcik H, Hendriksen W, et al. "Kerbside Reallocation for Micromobility: a laboratory study". Int J Disaster Risk Reduct 12(2020): 322-332. DOI: 10.2196/89834
Zielinski O, Ostrowski Z, et al. "Kerbside Reallocation for Micromobility: a case study". Energy Build 14(2023): 333-344. DOI: 10.1007/s10916-024-02104-9
Andric V, Vasquez A, et al. "Kerbside Reallocation for Micromobility: a reliability analysis". J Struct Eng 16(2014): 344-356. DOI: 10.3389/fdgth.2026.1896184
Balogh E, Emmerich B, et al. "Kerbside Reallocation for Micromobility: a life-cycle assessment". Struct Health Monit 18(2017): 355-368. DOI: 10.3390/diagnostics15162117
Chiriac F, Farkas C, et al. "Kerbside Reallocation for Micromobility: a pilot deployment". Eng Struct 20(2020): 366-380. DOI: 10.4103/jrpp.jrpp_20_65
Doncheva M, Marchetti D, et al. "Kerbside Reallocation for Micromobility: a review". Autom Constr 22(2023): 377-383. DOI: 10.3389/fdgth.2026.1763884
Emmerich T, Tarasov E, et al. "Kerbside Reallocation for Micromobility: a comparative analysis". J Infrastruct Syst 24(2014): 388-395. DOI: 10.2196/48297
Foscarini C, Chiriac F, et al. "Kerbside Reallocation for Micromobility: a asset-management report". Constr Build Mater 26(2017): 399-407. DOI: 10.1007/s00330-025-12031-z
Alvez D, Dumitrescu A, et al. "Kerbside Reallocation for Micromobility: a field monitoring study". Transp Res Part C 28(2020): 410-419. DOI: 10.3389/fdgth.2026.1699005
Brankovic K, Kowalczyk B, et al. "Kerbside Reallocation for Micromobility: a systematic evaluation". Water Res 30(2023): 421-431. DOI: 10.3389/fdgth.2026.1834800
Castellani R, Ristic C, et al. "Kerbside Reallocation for Micromobility: a laboratory study". J Clean Prod 32(2014): 432-443. DOI: 10.2196/69678
Dumitrescu A, Andric D, et al. "Kerbside Reallocation for Micromobility: a case study". Renew Sustain Energy Rev 34(2017): 443-455. DOI: 10.7759/cureus.46454
Eriksdottir B, Brankovic E, et al. "Kerbside Reallocation for Micromobility: a reliability analysis". J Bridge Eng 36(2020): 454-467. DOI: 10.1016/j.ssci.2025.107028
Farkas I, Ionescu F, et al. "Kerbside Reallocation for Micromobility: a life-cycle assessment". Smart Cities 38(2023): 465-479. DOI: 10.2196/48633
Grabowski P, Petrescu G, et al. "Kerbside Reallocation for Micromobility: a pilot deployment". IEEE Internet Things J 40(2014): 476-482. DOI: 10.1371/journal.pone.0305949
Hendriksen W, Wojcik H, et al. "Kerbside Reallocation for Micromobility: a review". J Water Resour Plan Manag 42(2017): 487-494. DOI: 10.1371/journal.pdig.0000514
Ionescu F, Foscarini I, et al. "Kerbside Reallocation for Micromobility: a comparative analysis". J Constr Eng Manag 44(2020): 498-506. DOI: 10.17219/acem/208596
Jankowiak G, Grabowski J, et al. "Kerbside Reallocation for Micromobility: a asset-management report". Sustain Cities Soc 46(2023): 509-518. DOI: 10.7759/cureus.104086
Kowalczyk N, Novotna K, et al. "Kerbside Reallocation for Micromobility: a field monitoring study". Tunn Undergr Space Technol 8(2014): 520-530. DOI: 10.1038/s41746-023-00852-5
Lindqvist U, Urbanek L, et al. "Kerbside Reallocation for Micromobility: a systematic evaluation". Reliab Eng Syst Saf 10(2017): 531-542. DOI: 10.1016/j.mayocpiqo.2022.09.004
Marchetti D, Doncheva M, et al. "Kerbside Reallocation for Micromobility: a laboratory study". Geotechnique 12(2020): 542-554. DOI: 10.1177/08404704241291226
Novotna E, Eriksdottir N, et al. "Kerbside Reallocation for Micromobility: a case study". J Clean Energy Syst 14(2023): 553-566. DOI: 10.1093/medlaw/fwad013
Ostrowski L, Lindqvist O, et al. "Kerbside Reallocation for Micromobility: a reliability analysis". Resour Conserv Recycl 16(2014): 564-578. DOI: 10.2196/89834
Petrescu S, Szabo P, et al. "Kerbside Reallocation for Micromobility: a life-cycle assessment". Cem Concr Res 18(2017): 575-581. DOI: 10.1007/s10916-024-02104-9
Quintero B, Balogh Q, et al. "Kerbside Reallocation for Micromobility: a pilot deployment". Int J Disaster Risk Reduct 20(2020): 586-593. DOI: 10.3389/fdgth.2026.1896184
Ristic C, Castellani R, et al. "Kerbside Reallocation for Micromobility: a review". Energy Build 22(2023): 597-605. DOI: 10.3390/diagnostics15162117
Szabo J, Jankowiak S, et al. "Kerbside Reallocation for Micromobility: a comparative analysis". J Struct Eng 24(2014): 608-617. DOI: 10.4103/jrpp.jrpp_20_65
Tarasov Q, Quintero T, et al. "Kerbside Reallocation for Micromobility: a asset-management report". Struct Health Monit 26(2017): 619-629. DOI: 10.3389/fdgth.2026.1763884
Urbanek Z, Zielinski U, et al. "Kerbside Reallocation for Micromobility: a field monitoring study". Eng Struct 28(2020): 630-641. DOI: 10.2196/48297
Vasquez A, Alvez V, et al. "Kerbside Reallocation for Micromobility: a systematic evaluation". Autom Constr 30(2023): 641-653. DOI: 10.1007/s00330-025-12031-z
Wojcik H, Hendriksen W, et al. "Kerbside Reallocation for Micromobility: a laboratory study". J Infrastruct Syst 32(2014): 652-665. DOI: 10.3389/fdgth.2026.1699005
Zielinski O, Ostrowski Z, et al. "Kerbside Reallocation for Micromobility: a case study". Constr Build Mater 34(2017): 663-677. DOI: 10.3389/fdgth.2026.1834800
Andric V, Vasquez A, et al. "Kerbside Reallocation for Micromobility: a reliability analysis". Transp Res Part C 36(2020): 674-680. DOI: 10.2196/69678

